Ver.26.1.3
Resource Gantt Chart
Display URLs
By setting the operation's property "(My Schedule) Operation URL" (Work_MyScheduleOperationURL) and uploading the resource Gantt chart,
a button to open that URL will be displayed on the timeline.
This property can be set either as a virtual property or as a regular property with a value.
Note that only URLs with the schemes http://, https://, or file:// can be opened from My Schedule.
warning
The file:// scheme is blocked by browsers under default settings.
Other Improvements and Bug Fixes
- (Improvement) Changed the design of the login screen when Active Directory user authentication is configured.
- (Improvement) Users can now set a "display name". Currently, the display name is only used for the username display while logged in (upper right of the page).
- (Improvement) Added a "Show password" button to the password input field on the login screen.
- (Improvement) Changed the name of the fingerprint file generated when authenticating My Schedule with e-Protector to
asfingerprint_myschedule_TIMESTAMP.c2v. This is to distinguish it from fingerprint files of NLS and Asprova e-Protector. - (Bug Fix) Fixed an issue where uploading the resource Gantt chart would fail when a label was attached to an operation without a main resource.
- (Bug Fix) Fixed an issue where retrieving the creation log file would fail when My Schedule is authenticated using e-Protector but the e-Protector is in an invalid state such as being expired.
- (Bug Fix) Fixed an issue in the resource Gantt chart where connection lines were drawn incorrectly for linked operations that have an overlap method of ESE, SSEEE, EES, or ESSEE but are not split.